Being a prime contractor with the Saudi Aramco, the following list shows a token selection from our client register

  Saudi Aramco
  Royal Commission for Yanbu
  Saudi Consolidated Electric Company

We have executed works for all these companies both as Prime and Sub Contractors in all disciplines previously stated. In the near future we have a firm intension of making additions to the above list with

  Al- Khafji Joint Operations (AGOC-AOC)
  Saudi Arabian Basic industries (SABIC) Group of companies
  Royal Commission - Jubail & Yanbu

Given below is a partial list of some of the recent works undertaken and completed by the company.
 

Sl. No.

Completed Projects

Status

1.

Setting up Portable Offices at South Refinery.

Completed

2.

Renovation of Berri Clinic

Completed

3.

Replacement of Manifold by R T R

Completed

4.

Provided on Rental Basis Offices On South Refinery.

Completed

5.

Remove Sand from the Sea Water Intake Canal

Completed

6.

C C R and OME Building Repair at Plant 476 B G P.

Completed

7.

Refurbish 4 nos AC Valve Boxes.

Completed

8.

Provide Portable Offices On South Refinery

Completed

9.

Renovate Various Locations at Juayma Tank Farm

Completed

10.

F-14 Hammam and Kitchen Repairs at B G P.

Completed

11.

Substation # 3 and C C R Doors Repair at B G P.

Completed

12.

Modify the Storage Shade at B G P Fire Station.

Completed

13.

Refurbishment of Najma South Sewage Lift Station

Completed

14.

Renovate Operations Hammam and Kitchens

Completed

15.

Renovate Inspection Building, Toilet and Store Room

Completed

16.

Hand Removal of packing From D-301 acid Gas Scrubber Drum, PLT- 475.

Completed

17.

Fabricate and Install New Cabinet for Maint. Shelter #41

Completed

18.

Replace of Water Piping and Various Jobs at Lab Bldg. At B G P

Completed

19.

Renovate the Operations Hammam’s at Area-3 B G P.

Completed

20.

Coating an 8" Schedule 40 Carbon Steel Pipe at Plant 50-T-182.

Completed

21.

Plant 474 O M E Offices Renovation B G P

Completed

22.

Replace Floor Tiles and Repaint Walls ROC/RM, PLT-476 & Various Jobs

Completed

23.

Renovate Pump House #2 Hammam at RT Terminal

Completed

24.

Replacement of Kitchen Cabinets of C C R Kitchen at PLT-476, B G P.

Completed

25.

Transfer Generator and Compressor

Completed

26.

BGP Maint. Bldg. Roof Repair

Completed

27.

Operator Shelter Renovation Plant 474, BGP.

Completed

28.

Asbestos Sheets Replacement at PLT-474 and Off-site Area B G P.

Completed

29.

Replace and Install New Industrial carpet

Completed

30.

Supply Portable Offices and Hammam during T & I at R 8402, Area-2, B G P.

Completed

31.

Fire proofing repair at Plant 470, BGP.

Completed

32.

Repair of Plant 376 E for Cooling Tower.

Completed

33.

Asbestos Sheets Replacement at PLT-476 R O Bldg B G P.

Completed

34.

Renovation of Juayma offshore hammam kitchen and Offices

Completed

35.

Berri Clinic Renovation B G P

Completed

36.

Renovation work at plant F-13 at Jubail Port

Completed

37.

Plant 10 Modify and A/C ducting in Foreman's Office

Completed

38.

Pre-Inspection for T& I Tanks

Completed

39.

Modification of rooms119& 120 at BG P admin Bldg

Completed

40.

Replace A/C and air handling units

Completed

41.

Replacement of U 405 A/B & U 409 sulphur chutes

Completed

42.

Replace corroded air line

Completed

43.

Walkways replacement at SWFE# 2

Completed

44.

Walkways replacement for flash # 4 in RT Refinery

Completed

45.

Removal and replacement of metal doors at JTP

Completed

50.

Fabrication and installation of 25 door shades at PLT 471 & 475

Completed

51.

Weeds and debris removal at JTF

Completed

52.

Misc. replacement work at PLT f- 13

Completed

53.

Modification of C-Tower vent line

Completed

54.

Manufacture rollers and spreader bars

Completed

55.

Repair of Plt 476 Cooling Tower

Completed

56.

Remove Weeds and general clean Ups

Completed

57.

Renovate F-14 N Sulphur Gate House

Completed

58.

Gully water sump pit repair

Completed

59.

Hand removal of Packing D-201

Completed

60.

Oily Water sump pit repair

Completed

61.

CCR Hammam Renovation

Completed

62.

F-14 and S. Gates misc. repair

Completed

63.

Renovation / Repair Maintenance. of shelter Hammam

Completed

64.

Replace AC units condenser coils and one condenser

Completed

Ongoing Projects
 

Sl.No.

ONGOING PROJECTS

STATUS

1

Renovation of T & I Office and Heavy Equipment Offices B G P.

On Going

2

Renovation of O M E Building Hammam of Plant 470

On Going

3

Replace the Existing Culvert Flare Bridge at Tanajib Plant.

On Going

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .